References

MVB Hamburg

At MVB Hamburg, bored piles were prepared using extensive sandblasting before being reinforced with shotcrete. These measures strengthen the piles and increase the stability of the building structures.

Sewage treatment plant Hetlingen

The maintenance work at the Hetlingen wastewater treatment plant is of great importance as it ensures the efficiency of plant operation. High-pressure washing and the application of an OS 5 coating serve to protect against corrosion and significantly extend the service life of the plant components.

University Hospital Hamburg-Eppendorf

Crack grouting at the UKE (University Medical Centre Hamburg-Eppendorf) requires careful preparation to ensure structural integrity. Precise measures ensure the long-term stability of the structures and contribute to the safety of the hospital.

Swissmill Silo Zürich 

The maintenance of the silo cells at Swissmill in Zurich is of great importance to ensure the integrity of the structures and food safety. This work, including refurbishment with shotcrete and coating, contributes to the long-term durability of the silos and ensures the quality of the stored products.

Georg Plange Mühle Neuss

The production of silo cell hoppers at Georg Plange Mühle Neuss using shotcrete is an important step in plant optimisation. The precise execution of this work plays a decisive role in the efficiency and quality of the production process.

DAL Group & Sayga Food Industries Port Sudan

Building silo cell hoppers in Port Sudan under extreme climatic conditions requires expertise and experience. These experts are crucial in order to build high-quality structures in this challenging environment.

Nuclear power plant Krümmel

At the Krümmel nuclear power plant, work with shotcrete plays a key role in reinforcing the concrete piles. These measures contribute to increasing the structural stability and safety of the plant.